Modernization of the hobbing machine ZFWZ630
search
  • Modernization of the hobbing machine ZFWZ630
  • Modernization of the hobbing machine ZFWZ630
  • Modernization of the hobbing machine ZFWZ630
  • Modernization of the hobbing machine ZFWZ630
  • Modernization of the hobbing machine ZFWZ630

Modernization of the hobbing machine ZFWZ630

zł13,530.00
Tax included

Modernization of the hobbing machine ZFWZ630

Quantity
Last items in stock

Drive System Modernization for ZFWZ 630 Gear Hobbing Machine

The control system repair of the ZFWZ 630 gear hobber involved implementing a modern thyristor converter for precise control of the existing VEM MBC 180M2-902 compound-wound DC motor (Pn=10kW, In=53A, Un=220VDC).

The integrated Mentor MP digital drive ensures stable speed regulation by adjusting the armature voltage using feedback systems (tachogenerator/encoder). This represents a major technological advancement over the original GDR-manufactured system, which relied on less precise field current regulation. The system is powered by a dedicated 3x400V / 3x160V matching transformer.

Hardware Deployment Specifications:

  • Main converter: Mentor MP 75A4 (Control Techniques Nidec), Un=3x400V, In=75A, non-regenerative DC industrial drive.
  • Protective devices: High-speed semiconductor fuse kit (100A) protecting the converter's thyristor modules.
  • Auxiliary systems: Control electronics power supply transformer and a dedicated motor field excitation circuit.
  • Enclosure system: Ventilated wall-mount enclosure (800x600x300) with an active cooling system, integrated onto the side panel of the existing control cabinet.

Scope of Project Execution:

  • Development of electrical schematics and documentation within the EPLAN Electric platform.
  • On-site hardware assembly, wiring, and electrical integration.
  • Drive parameter configuration, system commissioning, and full-load operational testing.
1 Item

You might also like

Comments (0)
No customer reviews for the moment.